COMPLETED PROJECTS
|
S/No.
|
PROJECT
|
SCOPE OF WORKS
|
STATUS
|
PROJECT IMPACT
|
1.
|
Narok Town Sewerage Project – Narok County
|
- Secondary Sewers (28.7 Km), Trunk Sewers (14.2 Km), Main Trunk Sewer (10.8 KM)
- Sewage Treatment Works (3500m3/d)
- Sewer Connections (500 Sewer Connections)
- Last Mile Water Connectivity (Rehabilitation of Existing Pump House, Extension of Water Reticulation and installation of consumer connections)
|
Project is 100% complete, operational, and commissioned on 15th April 2023
|
The project is operational, with 500 new sewer connections serving a population of 31,000 people and 2,400 new water connections serving a population of 78,500 people.
|
2.
|
Olkalou Town Sewerage Project – Nyandarua County
|
Sewerage Works
- Construction of Wastewater treatment plant (3,300 m3/day )
- Laying of trunk sewers
- laying of secondary and tertiary sewers,
- Construction of 1 No. Public Sanitation block
- 500 No. customer connection
Water Supply Works
- Construction of a conventional water treatment plant (2,000 m3/day).
- Laying a distribution main
- Rehabilitation works for the existing 18 km Malewa transmission main
- Construction of Administration/ laboratory building
|
Overall work progress: 98.7%
|
·
- The STP-to serve a population of 68,800 in the year 2040.
- There are 458 operational connections on the sewerage system
- The Improved WTP -to serve a population of 30,500.
- Consumers within the core area of the town are connected to the treated water system
|
3.
|
Chepareria Sewerage Project – West Pokot County
|
- Laying of Sewerage System pipes (10.508km)
- Wastewater Treatment Plant (1000m3/d)
- Buildings (Office/ Lab, Staff House, Ablution Block, Guard House)
- Others-Access Roads, Perimeter Fence and Gate
|
Overall work progress: 100 %
|
- Sewerage network was designed in order to cover as many dwellings as possible- demand 1,000m3/ day by 2040
|
4
|
Kiptogot Kolongolo Water Supply Project – Trans Nzoia County
|
Mubiru Water Supply System:
- Intake Works at Mubere River
- Raw water gravity main
- Water treatment plant
- Electrification of the water treatment plant
- Treated water gravity Main
- Construction of stirage tanks ( kiptuimet, Kwanza, Kolongolo)
Kaptega System
- Intake Works
- Raw gravity Main
- Water Treatment Plant
- Electrification of Water Traetment Plant
- Treated Water gravity main transmission piping
- Construction of Water storage Tanks (Kayos, Kapomboi)
- Office of RE at Endebes
- Provision of three motor vehicles , motor cycles, office equipment's, lab tools and workshop equipments
|
Overall work progress is at 100 %
|
- Provide the year 2030 water requirements of 16,000m3/day to a projected population of 240,000 people in the service area ( Endebess, Chepchoina, Kapomboi, Kwanza and Keiyo wards in Endebess and Kwanza Sub Counties)
|
5.
|
Malaba Sewerage project Lot 2 – Busia County
|
- Preliminary treatment
- A total of 12 waste stabilization ponds are to be constructed to treat up to 4000m3/day of waste water.
- Construction of Sewer lines (200mm to 600mm) of length 27.91km.
- Construction of three main trunk sewer lines of diameter (200-600 HDPE (DWC) of length of 16.8km.
- Eleven secondary trunk lines of diameter 200mm, total length 11.11 km.
- Construction of access roads.
- Construction of staff houses .
- 5 number Ablution blocks at Amagoro, Kocholia, Onyunyuri, Okima and Amoni Markets
- Fencing of the site for stabilization ponds.
|
Overall work progress is at 99.9%
|
- Improve wastewater management services within Malaba Township as the current population is being served by several pit latrines and septic tanks.
|
6.
|
Oyugis Water Supply Project – Homabay County
|
- Intake works
- Raw water Main
- Water Treatment Works (12, 300 m3/day)
- Treated Water Main
- Service Tank
- Water Distribution System
- Sanitation System
- HOMAWASCO Office Building
- Rehabilitation Works
- Supply of Operation and maintenance tools and Equipment
|
Overall work progress is at 99%
|
- Improve accessibility of portable water at Oyugis Town and its environs.
- 200No. Individual connections done as piloting for LMC within this project
- Activation of 500No. Connections which were inactive due to water insufficiency
- The project will ultimately benefit 119,793 people as at 2040
|
7.
|
Kendubay Water Supply Project – Homabay County
|
- Intake Works at River Awach Kibuon
- Raw Water Main (8km)
- Water Treatment Works (5,700m3/d capacity)
- Treated Water Main (15km)
- Service Tank (2000m3)
- Water Distribution System (11km)
- Sanitation System
- Supply of Operation and Maintenance Tools and Equipment
|
Overall work progress is at 99 %.
|
- Improve accessibility of portable water at Kendu Bay Town and its environs.
- The project will ultimately benefit 52,830 people
|
8.
|
Ugunja-Ukwala-Sega Water Supply Project
|
- New Intake Works
- Conventional Water Treatment Plant (8,400m3/day)
- A Power House with a headrace and tailrace canal, DN 1,500 Steel Penstock and a Hydro Turbine for pumping water.
- A Pump House.
- Rising Main DN 400 to Madungu (11.6km)
- Transmission pipelines ( OD 200 to DN 400)
- Distribution pipelines in Ugunja, Sega and Ukwala (54km)
- 1,500m3 Concrete Ground Tank and 4 No. Steel Elevated Tanks Capacity ranging from 300m3 to 500m3
- 10 No. Water Kiosks and 3 No. Ablution Blocks
- Administrative Buildings and Staff Quarters
|
The project is currently under DNP.
Overall work progress is at 93%
|
- Improve accessibility of portable water in 3No. Towns (Ugunja, Ukwala and Sega) Towns and its environs.
- The project will ultimately benefit 62,133 people
|
9.
|
Last Mile Connectivity for Siaya and Bondo Towns – Lot 3 Siaya County
|
- Distribution network pipelines
- Construction of a return line from Nyamninia to Yala.
- Renovation of the old Sidindi Malanga Rising Main.
- Calibration of the Nyamninia Tank and Treatment Work Master Meters.
- Supply and Development GIS based consumer database.
- Provision and connection of about 2,000-consumer
- Supply of equipment's
- Construction of 2No.100-m3 Masonry Tanks
- Supply and installation of 6No. 10M3 Plastic tanks
- Zoning and Provision of Zonal Meters 14 No.
- Supply and Installation of distribution Sewer pipes-9km
- Provision and connection of about 60 customers to the Sewer network.
- Reinstatement/renovation of perimeter fence at waste water treatment ponds-Pap kakan
- Replacement of Air Blower line at Yala treatment plant.
|
Overall work progress is at 99%
|
- 3,000 No. Individual Connections done at (Siaya and Bondo) towns by the project translating to approx. 20,000 people benefiting directly from the project
|
10
|
Malaba Water Supply Project-Lot 1 Busia County
|
- Gravity intake upstream (11km)
- Gravity main pipeline (13.2 km)
- Water treatment plant of 6,000m³/day
- Rehabilitation of existing treatment works
- Rehabilitation of existing pipelines
- Rehabilitation of Water Storage Tanks
- Construction of new storage masonry tanks at Amagoro 225m3 and Kimaeti 150m3.
- Construction of 7 No Community Water points.
- Ancillary works i.e fencing and landscaping of sites
|
Overall work progress is at 92.8%
|
- The project will serve a total of 180,000 residents of Amagoro, Sirisia , Mwari, Kimaeti, kitabisi, betima, khulisiru, Nalondo, Malaba Kocholia, koteko and Amoni towns and their livestock.
|
11.
|
Last Mile Connectivity for Migori and Isebania Towns – Lot 2 Migori County
|
- Distribution network pipelines in Migori (148.7km)
- Distribution network pipelines in Isebania (66km)
- 3,000No. Individual Connections
|
Overall work progress is at 97%
|
- 3,000No. Individual Connections done at (Migori and Isebania) towns by the project translating to approx. 20,000 people benefiting directly from the project
|
ONGOING PROJECTS
|
1.
|
Last Mile Connectivity for Keroka Town – Lot 1 Nyamira County
|
- Replacement, supply and installation of Rising Main
- Supply and Installation of distribution network pipelines (40km)
- Renovation works of 2No. 225 m³ Booster Station Storage Tanks.
- 150 m³ Steel Elevated Tank at Ichuni.
- 3 No. 5m³ Break Pressure Tanks along the Backline to T/Works.
- Supply and installation of an additional 500 No Consumer Water Meters
- Supply an Exhauster Truck, 6m³ exhauster (wastewater)
|
Overall work progress is at 94%
|
- 1,000No. Individual Connections to be done at towns by the project translating to approx. 10,000 people benefiting directly from the project
- Pipe intensification has reactivated 500No. Existing Connections therefore reducing NRW
- Exhauster purchased from the project will improve the sanitation management at Keroka Town
|
2.
|
Last Mile connectivity Project for Eldoret Town-Uasin Gishu County
|
- Sewerage System Extension Works (47.6km) Sewer line
- Sewerage System Rehabilitation Works (48.9km) Sewer line
- Rehabilitation Works in Boundary WWTP as per the revised scope
- Rehabilitation Works in Quarry WWTP as per the revised scope
|
Overall work progress is at 86%
|
- Improved intensification of sewer connection within Eldoret Town and its environs
- The project will ultimately benefit approx. 60,000 people
- Improved quality of the effluent discharge.
|
3
.
|
Kilgoris Water Supply and Sanitation Project - Narok County
|
- River Intake Weir
- Raw Water Main
- Raw Water Pump. Station (2)
- Treatment Works Treated Water Pump Station.
- Treated Water Main
- Gravity Mains
- Distribution Pipes
- Water Storage Tanks (4tanks No.)
- Rehabilitation Works
- Building Works
- Power Supply for WTP and Intake Site
- Other elements (4 No. Ablution blocks, and 5 No. Water Kiosks)
|
Overall work progress is at 78%
|
- Improve accessibility of portable water in Kilgoris and Lolgorian Towns and its environs.
- The project will ultimately benefit 41,000 people
|
4.
|
Nandi Hills Water Supply and Sanitation Project-Nandi County
|
- Construction of 1No. Intake Works
- Raw water main (60m)
- Raw Water Pump Station
- Conventional WTP
- Laying of 2N0. Rising Main
- Treated Water Pumping Station
- Laying of 24.5 Km Distribution Main
- 1 No. Contact Tank
- 3No. Storage Tanks
- Rehabilitation Works at Existing Water Supply system
- Building Works
- Power Supply
- Construction of 3No. Ablution Blocks
|
Overall work progress is at 78%
|
- Improve accessibility of portable water in Nandi Hills Town and its environs.
- The project will ultimately benefit 26,870 people
|
5.
|
Last Mile connectivity Project for Kakamega Town-Kakamega County
|
- Extension of water distribution network (15, 689 km)
- Rehabilitation of sewers (1,798Km)
- Rehabilitation of Shirere WWTP
- Rehabilitation of Masinde Muliro WTP
- Associated Components ( Training of KACWASCO) and climate change mitigation measurers
|
Overall work progress is at 65%
|
- Improved intensification of water connection within Kakamega Town and its environs
- The project will ultimately benefit approx. 20,000 people
|
6.
|
Bomet - Mulot Water Supply and Sanitation Project-Bomet County
|
Construction of:
- Intake Works
- Raw Water Main
- Water Treatment Works
- Treated Water Mains
- Water Storage Tanks
- Water Distribution System
- Water Kiosks
- Sanitation System
- Resident Engineer’s Office
- LVSWWDA Office Building in Kisumu
|
Overall work progress is at 34.59%
|
- Improve accessibility of portable water in Bomet East, Bomet Central and Chepalungu Sub-counties (Bomet town inclusive) and its environs.
- The project will ultimately benefit 117,300 people
|
7.
|
Kapenguria – Makutano Sewerage Project-West Pokot County
|
- Laying of Sewerage system Pipes (20.4km)
- Construction of 3000m3/d WWTP and Site Works
- 650 Customer Connections for KAWASES
|
|
|