COMPLETED PROJECTS

S/No.

PROJECT

SCOPE OF WORKS

STATUS

PROJECT IMPACT

1.

 

 

 

 

 

Narok Town Sewerage Project – Narok County

 

 

 

 

  • Secondary Sewers (28.7 Km), Trunk Sewers (14.2 Km), Main Trunk Sewer (10.8 KM)
  • Sewage Treatment Works (3500m3/d)
  • Sewer Connections (500 Sewer Connections)
  • Last Mile Water Connectivity (Rehabilitation of Existing Pump House, Extension of Water Reticulation and installation of consumer connections)

Project is 100% complete, operational, and commissioned on 15th April 2023

 

 

 

The project is operational, with 500 new sewer connections serving a population of 31,000 people and 2,400 new water connections serving a population of  78,500 people.

 

 

 

2.

 

 

 

 

 

 

 

 

 

 

Olkalou Town Sewerage Project – Nyandarua County

 

 

 

 

 

 

 

 

 

Sewerage Works

  • Construction of Wastewater treatment plant (3,300 m3/day )
  • Laying of trunk sewers
  • laying of secondary and tertiary sewers,
  • Construction of 1 No. Public Sanitation block
  • 500 No. customer connection

Water Supply Works

  • Construction of a conventional water treatment plant (2,000 m3/day).
  • Laying a distribution main
  • Rehabilitation works for the existing 18 km Malewa transmission main
  • Construction of Administration/ laboratory building

Overall work progress: 98.7%

 

 

 

 

 

 

 

 

 

 

 

· 

  • The STP-to serve a population of 68,800 in the year 2040.
  • There are 458 operational connections on the sewerage system
  • The Improved WTP -to serve a population of 30,500.
  • Consumers within the core area of the town are connected to the treated water system

 

 

 

 

 

 

 

 

3.

 

 

Chepareria Sewerage Project – West Pokot County

 

 

  • Laying of Sewerage System pipes (10.508km)
  • Wastewater Treatment Plant (1000m3/d)
  • Buildings (Office/ Lab, Staff House, Ablution Block, Guard House)
  • Others-Access Roads, Perimeter Fence and Gate

Overall work progress: 100 %

 

 

 

  • Sewerage network was designed in order to cover as many dwellings as possible- demand 1,000m3/ day by 2040

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

Kiptogot Kolongolo Water Supply Project – Trans Nzoia County

 

 

 

 

 

 

 

 

 

 

 

 

Mubiru Water Supply System:

  • Intake Works at Mubere River
  • Raw water gravity main
  • Water treatment plant
  • Electrification of the water treatment plant
  • Treated water gravity Main
  • Construction of stirage tanks ( kiptuimet, Kwanza, Kolongolo)

Kaptega System

  • Intake Works
  • Raw gravity Main
  • Water Treatment Plant
  • Electrification of Water Traetment Plant
  • Treated Water gravity main transmission piping
  • Construction of Water storage Tanks (Kayos, Kapomboi)
  • Office of RE at Endebes
  • Provision of three  motor vehicles , motor cycles, office equipment's, lab tools and workshop equipments

Overall work progress is at  100 %

 

 

 

 

 

 

 

 

 

 

 

 

 

  • Provide the year 2030 water requirements of 16,000m3/day to a projected population of 240,000 people in the service area ( Endebess, Chepchoina, Kapomboi, Kwanza and Keiyo wards in Endebess and Kwanza Sub Counties)

 

 

 

 

 

 

 

 

 

 

5.

 

 

 

 

 

 

 

 

 

 

Malaba Sewerage project Lot 2 – Busia County

 

 

 

 

 

 

 

 

 

  • Preliminary treatment
  • A total of 12 waste stabilization ponds are to be constructed to treat up to 4000m3/day of waste water.
  • Construction of Sewer lines (200mm to 600mm)  of length  27.91km.
  • Construction of three main trunk sewer lines of diameter (200-600 HDPE (DWC) of length of 16.8km.
  • Eleven secondary trunk lines of diameter 200mm, total length 11.11 km.
  • Construction of access roads.
  • Construction of staff houses .
  • 5 number Ablution blocks at Amagoro, Kocholia, Onyunyuri, Okima and Amoni Markets
  • Fencing of the site for stabilization ponds.

Overall work progress is at  99.9%

 

 

 

 

 

 

 

 

 

  • Improve wastewater management services within Malaba Township as the current population is being served by several pit latrines and septic tanks.

 

 

 

 

 

 

 

 

 


6.

 

 

 

 

 

 

Oyugis Water Supply Project – Homabay County

 

 

 

 

  • Intake works
  • Raw water Main
  • Water Treatment Works (12, 300 m3/day)
  • Treated Water Main
  • Service Tank
  • Water Distribution System
  • Sanitation System
  • HOMAWASCO Office Building
  • Rehabilitation Works
  • Supply of Operation and maintenance tools and Equipment

Overall work progress is at  99%

 

 

 

 

 

  • Improve accessibility of portable water at Oyugis Town and its environs.
  • 200No. Individual connections done as piloting for LMC within this project
  • Activation of 500No. Connections which were inactive due to water insufficiency
  • The project will ultimately benefit 119,793 people as at 2040

 

 

7.

 

 

 

 

Kendubay Water Supply Project – Homabay County

 

 

 

 

  • Intake Works at River Awach Kibuon
  • Raw Water Main (8km)
  • Water Treatment Works (5,700m3/d capacity)
  • Treated Water Main (15km)
  • Service Tank (2000m3)
  • Water Distribution System (11km)
  • Sanitation System
  • Supply of Operation and Maintenance Tools and Equipment

Overall work progress is at 99 %.

 

 

 

 

  • Improve accessibility of portable water at Kendu Bay Town and its environs.
  • The project will ultimately benefit 52,830 people

 

 

 

 

8.

 

 

 

 

 

 

 

 

 

 

 

Ugunja-Ukwala-Sega Water Supply Project

 

 

 

 

 

 

 

 

 

 

  • New Intake Works
  • Conventional Water Treatment Plant (8,400m3/day)
  • A Power House with a headrace and tailrace canal, DN 1,500 Steel Penstock and a Hydro Turbine for pumping water.
  • A Pump House.
  • Rising Main DN 400 to Madungu (11.6km)
  • Transmission pipelines ( OD 200 to DN 400)
  • Distribution pipelines in Ugunja, Sega and Ukwala (54km)
  • 1,500m3 Concrete Ground Tank and 4 No. Steel Elevated Tanks Capacity ranging from 300m3 to 500m3
  • 10 No. Water Kiosks and 3 No. Ablution Blocks
  • Administrative Buildings and Staff Quarters

The project is currently under DNP.

Overall work progress is at 93%

 

 

 

 

 

 

 

 

  • Improve accessibility of portable water in 3No. Towns (Ugunja, Ukwala and Sega) Towns and its environs.
  • The project will ultimately benefit 62,133 people

 

 

 

 

 

 

 

 

 

9.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Last Mile Connectivity for Siaya and Bondo Towns – Lot 3 Siaya  County

 

 

 

 

 

 

 

 

 

 

 

 

  • Distribution network pipelines
  • Construction of a return line from Nyamninia to Yala.
  • Renovation of the old Sidindi Malanga Rising Main.
  • Calibration of the Nyamninia Tank and Treatment Work Master Meters.
  • Supply and Development GIS based consumer database.
  • Provision and connection of about 2,000-consumer
  • Supply of equipment's
  • Construction of 2No.100-m3 Masonry Tanks
  • Supply and installation of 6No. 10M3 Plastic tanks
  • Zoning and Provision of Zonal Meters 14 No.
  • Supply and Installation of distribution Sewer pipes-9km
  • Provision and connection of about 60 customers to the Sewer network.
  • Reinstatement/renovation of perimeter fence at waste water treatment ponds-Pap kakan
  • Replacement of Air Blower line at Yala treatment plant.

 

Overall work progress is at 99%

 

 

 

 

 

 

 

 

 

 

 

 

 

  • 3,000 No. Individual Connections done at (Siaya and Bondo) towns by the project translating to approx. 20,000 people benefiting directly from the project

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

Malaba Water Supply Project-Lot 1 Busia County

 

 

 

 

 

 

  • Gravity intake upstream (11km)
  • Gravity main pipeline (13.2 km)
  • Water treatment plant of 6,000m³/day
  • Rehabilitation of existing treatment works
  • Rehabilitation of existing pipelines
  • Rehabilitation of Water Storage Tanks
  • Construction of new storage masonry tanks at Amagoro 225m3 and Kimaeti 150m3.
  • Construction of 7 No Community Water points.
  • Ancillary works i.e fencing and landscaping of sites

Overall work progress is at  92.8%

 

 

 

 

 

  • The project will serve a total of 180,000 residents of Amagoro, Sirisia , Mwari, Kimaeti, kitabisi, betima, khulisiru, Nalondo, Malaba Kocholia, koteko and Amoni towns and their livestock.

 

 

 

 

11.

 

 

Last Mile Connectivity for Migori and Isebania Towns – Lot 2 Migori County  

 

  • Distribution network pipelines in Migori (148.7km)
  • Distribution network pipelines in Isebania (66km)
  • 3,000No. Individual Connections

Overall work progress is at 97%

 

  • 3,000No. Individual Connections done at (Migori and Isebania) towns by the project translating to approx. 20,000 people benefiting directly from the project

 

ONGOING PROJECTS

1.

 

 

 

 

 

 

 

 

Last Mile Connectivity for Keroka Town – Lot 1 Nyamira County

 

 

 

 

 

 

 

 

  • Replacement, supply and installation of Rising Main
  • Supply and Installation of distribution network pipelines (40km)
  • Renovation works of 2No. 225 m³ Booster Station Storage Tanks.
  • 150 m³ Steel Elevated Tank at Ichuni.
  • 3 No. 5m³ Break Pressure Tanks along the Backline to T/Works.
  • Supply and installation of an additional 500 No Consumer Water Meters
  • Supply an Exhauster Truck, 6m³ exhauster (wastewater) 

Overall work progress is at  94%

 

 

 

 

 

 

 

 

  • 1,000No. Individual Connections to be done at towns by the project translating to approx. 10,000 people benefiting directly from the project
  • Pipe intensification has reactivated 500No. Existing Connections therefore reducing NRW
  • Exhauster purchased from the project will improve the sanitation management at Keroka Town

 

 

 

 

 

2.

 

 

 

 

Last Mile connectivity Project for Eldoret Town-Uasin Gishu County

 

 

 

 

  • Sewerage System Extension Works (47.6km) Sewer line
  • Sewerage System Rehabilitation Works (48.9km) Sewer line
  • Rehabilitation Works in Boundary WWTP as per the revised scope
  • Rehabilitation Works in Quarry WWTP as per the revised scope  

Overall work progress is at  86%

 

 

 

 

  • Improved intensification of sewer connection within Eldoret Town and its environs
  • The project will ultimately benefit approx. 60,000 people
  • Improved quality of the effluent discharge.

 

 

3

 

 

 

 

 

 

 

.

Kilgoris Water Supply and Sanitation Project - Narok  County

 

 

 

 

 

 

 

  • River Intake Weir
  • Raw Water Main
  • Raw Water Pump. Station (2)
  • Treatment Works Treated Water Pump Station.
  • Treated Water Main
  • Gravity Mains
  • Distribution Pipes
  • Water Storage Tanks (4tanks No.)
  • Rehabilitation Works
  • Building Works
  • Power Supply for WTP and Intake Site
  • Other elements (4 No. Ablution blocks, and 5 No. Water Kiosks)

Overall work progress is at  78%

 

 

 

 

 

 

 

  • Improve accessibility of portable water in Kilgoris and Lolgorian Towns and its environs.
  • The project will ultimately benefit 41,000 people

 

 

 

 

 

 

4.

 

 

 

 

 

 

 

Nandi Hills Water Supply and Sanitation Project-Nandi County

 

 

 

 

 

 

 

  • Construction of 1No. Intake Works
  • Raw water main (60m)
  • Raw Water Pump Station
  • Conventional WTP
  • Laying of 2N0. Rising Main
  • Treated Water Pumping Station
  • Laying of 24.5 Km Distribution Main
  • 1 No. Contact Tank
  • 3No. Storage Tanks
  • Rehabilitation Works at Existing Water Supply system
  • Building Works
  • Power Supply
  • Construction of 3No. Ablution Blocks

Overall work progress is at  78%

 

 

 

 

 

 

  • Improve accessibility of portable water in Nandi Hills Town and its environs.
  • The project will ultimately benefit 26,870 people

 

 

 

 

 

5.

 

 

 

 

Last Mile connectivity Project for Kakamega Town-Kakamega County

 

 

 

 

  • Extension of water distribution network (15, 689 km)
  • Rehabilitation of sewers (1,798Km)
  • Rehabilitation of Shirere WWTP
  • Rehabilitation of Masinde Muliro WTP
  • Associated Components ( Training of KACWASCO) and climate change mitigation measurers

Overall work progress is at  65%

 

 

 

  • Improved intensification of water connection within Kakamega Town and its environs
  • The project will ultimately benefit approx. 20,000 people

 

 

6.

 

 

 

 

 

 

 

Bomet - Mulot Water Supply and Sanitation Project-Bomet County

 

 

 

 

 

 

Construction of:

  • Intake Works
  • Raw Water Main
  • Water Treatment Works
  • Treated Water Mains
  • Water Storage Tanks
  • Water Distribution System
  • Water Kiosks
  • Sanitation System
  • Resident Engineer’s Office
  • LVSWWDA Office Building in Kisumu

 

Overall work progress is at 34.59%

 

 

 

 

 

 

 

  • Improve accessibility of portable water in Bomet East, Bomet Central and Chepalungu Sub-counties (Bomet town inclusive) and its environs.
  • The project will ultimately benefit 117,300 people

 

 

 

 

 

7.

 

 

 

Kapenguria – Makutano Sewerage Project-West Pokot County

 

 

  • Laying of Sewerage system Pipes (20.4km)
  • Construction of 3000m3/d WWTP and Site Works
  • 650 Customer Connections for KAWASES
   

Date

06 February 2024

Tags

Kenya Towns

Service Charter Audio

Sign Language

About Us

The Central Rift Valley Water Works Development Agency (CRVWWDA) is one of the nine (9) Water Works Development Agencies in Kenya and was formed under Section 65 of the Water Act, 2016. It was established through Kenya Gazette Notice No. 4 dated 7thFebruary 2020. The region served by the Agency comprise of the five Counties of Nakuru, Narok, Laikipia, Baringo and Nyandarua.

Read More

Quick Links